DPR_PROJ_INTEGRATION086 - Planned start (Portf. Mgmt) initial, (PS) &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 086

  • Message text: Planned start (Portf. Mgmt) initial, (PS) &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION086 - Planned start (Portf. Mgmt) initial, (PS) &1 ?

    The SAP error message DPR_PROJ_INTEGRATION086 typically occurs in the context of project management, particularly when dealing with project integration between Portfolio Management (PM) and Project System (PS). This error indicates that there is a mismatch or inconsistency regarding the planned start date of a project between the two systems.

    Cause:

    The error message DPR_PROJ_INTEGRATION086 is triggered when:

    • The planned start date in Portfolio Management does not match the planned start date in Project System.
    • There may be a missing or incorrect configuration in the integration settings between Portfolio Management and Project System.
    • The project might not have been properly initialized or set up in one of the systems.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Planned Start Dates:

      • Verify the planned start date in both Portfolio Management and Project System. Ensure that they are consistent and match each other.
    2. Adjust Dates:

      • If there is a discrepancy, adjust the planned start date in either Portfolio Management or Project System to ensure they align.
    3. Integration Settings:

      • Review the integration settings between Portfolio Management and Project System. Ensure that the configuration is correct and that both systems are properly linked.
    4. Project Initialization:

      • Ensure that the project has been properly initialized in both systems. If necessary, reinitialize the project in the system where it is not set up correctly.
    5. Consult Documentation:

      • Refer to SAP documentation or notes related to DPR_PROJ_INTEGRATION086 for any specific guidelines or additional troubleshooting steps.
    6. Check for Updates:

      • Ensure that your SAP system is up to date with the latest patches and updates, as this may resolve known issues related to project integration.
    7. Contact Support:

      • If the issue persists after trying the above steps, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) and CProject (Project Management) to navigate and check project details.
    • SAP Notes: Look for SAP Notes that may address this specific error or provide additional context.
    • User Roles: Ensure that you have the necessary permissions to view and edit project details in both Portfolio Management and Project System.

    By following these steps, you should be able to identify and resolve the cause of the error message DPR_PROJ_INTEGRATION086.

    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic SAP error explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker