How To Fix DPR_PROJ_INTEGRATION086 - Planned start (Portf. Mgmt) initial, (PS) &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 086

  • Message text: Planned start (Portf. Mgmt) initial, (PS) &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION086 - Planned start (Portf. Mgmt) initial, (PS) &1 ?
    The SAP error message DPR_PROJ_INTEGRATION086 typically occurs in the context of project management, particularly when dealing with project integration between Portfolio Management (PM) and Project System (PS). This error indicates that there is a mismatch or inconsistency regarding the planned start date of a project between the two systems.
    
    Cause: The error message DPR_PROJ_INTEGRATION086 is triggered when: The planned start date in Portfolio Management does not match the planned start date in Project System. There may be a missing or incorrect configuration in the integration settings between Portfolio Management and Project System. The project might not have been properly initialized or set up in one of the systems.
    Solution: To resolve this error, you can take the following steps: Check Planned Start Dates: Verify the planned start date in both Portfolio Management and Project System. Ensure that they are consistent and match each other. Adjust Dates: If there is a discrepancy, adjust the planned start date in either Portfolio Management or

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.