How To Fix DPR_PROJ_INTEGRATION082 - Percentage of completion (Portf. Mgmt) &1, (PS) &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 082

  • Message text: Percentage of completion (Portf. Mgmt) &1, (PS) &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION082 - Percentage of completion (Portf. Mgmt) &1, (PS) &2 ?
    The SAP error message DPR_PROJ_INTEGRATION082 typically relates to issues with the percentage of completion in project management, particularly when integrating Portfolio Management (DPR) with Project System (PS). This error can occur when there is a mismatch or inconsistency in the percentage of completion values between the two systems.
    
    Cause: Data Inconsistency: The percentage of completion in the Portfolio Management (DPR) does not match the percentage of completion in the Project System (PS). Incorrect Configuration: There may be configuration issues in the integration settings between DPR and PS. Missing Data: Required data for calculating the percentage of completion may be missing or incorrectly entered. Status Issues: The project or task may be in a status that does not allow for updates to the percentage of completion.
    Solution: Check Data Consistency: Verify the percentage of completion values in both DPR and PS. Ensure they are aligned and consistent. Review Configuration: Check the integration settings between DPR and PS to ensure

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant