Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix DPR_PROJ_INTEGRATION008 - Task parent not found for task with outline number &1; task not created


DPR_PROJ_INTEGRATION008 - Overview

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 008

  • Message text: Task parent not found for task with outline number &1; task not created

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


DPR_PROJ_INTEGRATION008 - Details

  • The SAP error message DPR_PROJ_INTEGRATION008 indicates that there is an issue with a task in a project where the parent task cannot be found. This typically occurs in the context of project management within SAP, particularly when dealing with project structures and task hierarchies.
    
    Cause: The error message is triggered when: Missing Parent Task: The task you are trying to create has a specified parent task (identified by an outline number), but that parent task does not exist in the system. Incorrect Outline Number: The outline number provided for the parent task may be incorrect or may not correspond to any existing task in the project. Project Structure Issues: There may be issues with the overall project structure, such as tasks being deleted or not properly linked.
    Solution: To resolve this error, you can take the following steps: Verify Parent Task: Check the outline number of the parent task you are trying to reference. Ensure that it is correct

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


DPR_PROJ_INTEGRATION008 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author