How To Fix DPR_PHASE024 - No authorization for project phase &1 which is assigned to phase &2


DPR_PHASE024 - Overview

  • Message type: E = Error

  • Message class: DPR_PHASE - Messages for Phases

  • Message number: 024

  • Message text: No authorization for project phase &1 which is assigned to phase &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PHASE024 - No authorization for project phase &1 which is assigned to phase &2 ?
    The SAP error message DPR_PHASE024 indicates that a user does not have the necessary authorization to access a specific project phase that is assigned to another phase. This typically occurs in the context of SAP Project Management (PS) or SAP Portfolio and Project Management (PPM) modules.
    
    Cause: The error is caused by a lack of authorization for the user to perform actions related to the specified project phase. This can happen due to: Missing Authorization Roles: The user may not have the required roles assigned that grant access to the project phase. Authorization Object Restrictions: The authorization objects related to project management may not be configured correctly for the user. Project Phase Configuration: The project phase may have specific restrictions or settings that limit access based on user roles or profiles.
    Solution: To resolve the DPR_PHASE024 error, you can take the following steps: Check User Roles: Verify the roles assigned to the user in the SAP system. Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author