Message type: E = Error
Message class: DPR_PARTICIPANT - Roles: Messages
Message number: 803
Message text: Role &1: Role type &2 is not valid for project type &3
You have included a role that has a role type that is not valid in
Customizing for the corresponding project type.
The system issues a warning message. However, you can still edit and
save the project.
We recommend that you change the role type of the included role so that
only those role types that are valid in Customizing are used in the
project. For more information, see Customizing for Project Managment
under <ZK>Resource Management</> -> <ZK>Basic Settings for Project Roles
</> -> <DS:SIMG.CPRO_PRP_ROLE>Define Project Role Types</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
DPR_PARTICIPANT803
- Role &1: Role type &2 is not valid for project type &3 ?The SAP error message DPR_PARTICIPANT803 indicates that there is an issue with the assignment of a role to a participant in a project. Specifically, it states that the role type specified is not valid for the project type you are working with. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Role Type Mismatch: The role you are trying to assign to a participant does not match the allowed role types for the specific project type. Each project type in SAP can have specific roles that are valid for it.
- Configuration Issues: The project type may not be properly configured to accept the role type you are trying to assign.
- Data Entry Error: There may be a typo or incorrect entry in the role type or project type.
Solution:
Check Role Configuration:
- Go to the project type configuration in SAP and verify which role types are valid for the project type you are working with.
- Ensure that the role you are trying to assign is included in the list of valid roles for that project type.
Modify Role Assignment:
- If the role is indeed invalid for the project type, you will need to either change the role to a valid one or change the project type to one that accepts the desired role.
Review Project Type Settings:
- Navigate to the project type settings in the SAP system and check if the role type can be added or if there are any restrictions in place.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on role types and project types to ensure compliance with the system's requirements.
Contact SAP Support:
- If you are unable to resolve the issue, consider reaching out to SAP support for assistance, especially if you suspect a configuration issue.
Related Information:
CJ20N
(Project Builder) or CJI3
(Project Actual Line Items) to view and manage project roles and participants.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
DPR_PARTICIPANT802
Role type &1 is not defined in Customizing
What causes this issue? The current role uses the role type &V1&. This role type no longer exists in Customizing. The status of the system is...
DPR_PARTICIPANT801
The SAP entry '0' cannot be modified with initial values
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PARTICIPANT804
Intervals in distribution table are inconsistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PHASE001
Select a valid phase type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.