How To Fix DPR_PARTICIPANT135 - Enter a calculation base for the distribution


DPR_PARTICIPANT135 - Overview

  • Message type: E = Error

  • Message class: DPR_PARTICIPANT - Roles: Messages

  • Message number: 135

  • Message text: Enter a calculation base for the distribution

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PARTICIPANT135 - Enter a calculation base for the distribution ?
    The SAP error message DPR_PARTICIPANT135, which states "Enter a calculation base for the distribution," typically occurs in the context of project management and resource planning within the SAP system, particularly in the SAP Project System (PS) or SAP Portfolio and Project Management (PPM) modules.
    
    Cause: This error usually arises when you are trying to distribute costs or resources in a project, but the system requires a calculation base to determine how the distribution should be carried out. The calculation base is essential for the system to understand how to allocate costs or resources among different participants or elements of the project.
    Solution: To resolve this error, you should take the following steps: Check Distribution Settings: Ensure that you have defined a calculation base for the distribution. This can typically be done in the project or resource planning settings. Enter Calculation Base: When prompted by the error message, enter a valid calculation base. This could be a

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant