How To Fix DPR_ENTITY_LINK008 - Task assignment: Work exceeds capacity of task


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_ENTITY_LINK - Roles: Messages

  • Message number: 008

  • Message text: Task assignment: Work exceeds capacity of task

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_ENTITY_LINK008 - Task assignment: Work exceeds capacity of task ?

    The SAP error message DPR_ENTITY_LINK008, which states "Task assignment: Work exceeds capacity of task," typically occurs in the context of project management within SAP, particularly when using the SAP Project System (PS) or SAP Portfolio and Project Management (PPM) modules. This error indicates that the total work assigned to a task exceeds the available capacity for that task, which can lead to scheduling and resource allocation issues.

    Causes:

    1. Over-Allocation of Resources: The total work assigned to a task may exceed the available capacity of the resources assigned to that task.
    2. Incorrect Capacity Settings: The capacity settings for the resources or the task may not be configured correctly, leading to discrepancies in available versus assigned work.
    3. Task Duration and Work Mismatch: The duration of the task may not align with the amount of work assigned, causing an overload.
    4. Resource Availability: Resources may not be available for the entire duration of the task, leading to an apparent over-allocation.
    5. Multiple Assignments: If multiple resources are assigned to the same task, their combined workload may exceed the task's capacity.

    Solutions:

    1. Review Resource Assignments: Check the resources assigned to the task and ensure that their total workload does not exceed their available capacity.
    2. Adjust Task Duration: If possible, extend the duration of the task to accommodate the assigned work.
    3. Reallocate Work: Distribute the workload among additional resources or adjust the workload assigned to existing resources to ensure it fits within their capacity.
    4. Check Capacity Settings: Verify the capacity settings for the resources and ensure they are configured correctly in the system.
    5. Use Resource Planning Tools: Utilize SAP's resource planning tools to analyze and optimize resource allocation and task assignments.
    6. Consult with Project Managers: Collaborate with project managers to understand the project requirements and make necessary adjustments to the task assignments.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) or CJI3 (Project Actual Line Items) to analyze project tasks and resource assignments.
    • Capacity Planning: Familiarize yourself with capacity planning concepts in SAP to better manage resource allocation and task assignments.
    • Documentation: Refer to SAP Help documentation for detailed guidelines on managing project tasks and resources effectively.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message or provide patches and updates.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the DPR_ENTITY_LINK008 error and ensure that your project tasks are properly aligned with resource capacities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker