Do you have any question about this error?
Message type: E = Error
Message class: DPR_CALC - cProjects Costing Integration
Message number: 102
Message text: Display import details
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_CALC102
- Display import details ?The SAP error message DPR_CALC102, which is related to the Project Management module, typically indicates an issue with the calculation of project-related data, particularly when importing details. This error can arise due to various reasons, including data inconsistencies, missing information, or configuration issues.
Cause:
- Data Inconsistencies: There may be inconsistencies in the data being imported, such as incorrect formats, missing mandatory fields, or invalid references.
- Missing Master Data: Required master data (like WBS elements, cost centers, etc.) may not exist in the system.
- Configuration Issues: The project management configuration may not be set up correctly, leading to issues during the import process.
- Authorization Issues: The user may not have the necessary authorizations to perform the import operation.
Solution:
- Check Data Format: Ensure that the data being imported adheres to the required format and that all mandatory fields are filled out correctly.
- Validate Master Data: Verify that all necessary master data exists in the system. If any required data is missing, create it before attempting the import again.
- Review Configuration: Check the configuration settings in the Project Management module to ensure they are set up correctly for the import process.
- Authorization Check: Ensure that the user performing the import has the necessary authorizations to access and modify the relevant project data.
- Error Logs: Review the error logs for more detailed information about the specific issue causing the error. This can provide insights into what needs to be corrected.
- Test Import with Sample Data: If possible, test the import process with a smaller set of sample data to identify any issues before attempting a larger import.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
DPR_CALC101
Data import is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC100
Execute test run
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC103
Display result details
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC104
&1 log entries deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.