Do you have any question about this error?
Message type: E = Error
Message class: DPR_API - Messages for APIs in Project Management
Message number: 010
Message text: Enter a project name
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_API010
- Enter a project name ?The SAP error message DPR_API010: Enter a project name typically occurs in the context of SAP Project Management, particularly when working with the Project System (PS) or the Demand Planning and Reporting (DPR) module. This error indicates that a required field for entering a project name has not been filled out, which is necessary for the system to process the request.
Cause:
- Missing Input: The most common cause is that the user has not entered a project name in the relevant field before attempting to save or process the project.
- Field Configuration: The project name field may be set as mandatory in the configuration, and if it is left blank, the system will trigger this error.
- User Interface Issue: Sometimes, the user interface may not display the field correctly, leading to confusion about where to enter the project name.
Solution:
- Enter a Project Name: The immediate solution is to ensure that you enter a valid project name in the designated field before proceeding. Make sure that the name adheres to any naming conventions or restrictions set by your organization.
- Check Field Settings: If you are consistently encountering this error, check the configuration settings for the project management module to ensure that the project name field is correctly set up and that there are no additional validation rules that might be causing the issue.
- User Training: Ensure that users are trained on the correct procedures for entering project information in SAP to avoid missing required fields.
- System Updates: If the issue persists, it may be worth checking if there are any system updates or patches that need to be applied, as bugs in the software can sometimes lead to unexpected behavior.
Related Information:
If the problem continues after trying these solutions, it may be necessary to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
DPR_API009
Enter a version number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_API008
&1 '&2' does not exist in version '&3'; check your entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_API011
Project & does not exist; check your entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_API012
Version number entered does not correspond to the selected input template
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.