How To Fix DO559 - Dependencies are ignored in order to allocate object & & &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DO - Dictionary: Mass activation of domains and data elements

  • Message number: 559

  • Message text: Dependencies are ignored in order to allocate object & & &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DO559 - Dependencies are ignored in order to allocate object & & & ?

    The SAP error message DO559, which states "Dependencies are ignored in order to allocate object & & &," typically occurs in the context of object allocation in SAP, particularly when dealing with dependent objects in a production or planning environment. This error indicates that the system is unable to consider certain dependencies while trying to allocate resources or objects, which can lead to issues in production planning, material requirements planning (MRP), or similar processes.

    Causes:

    1. Missing Dependencies: The system may not have the necessary information about dependencies between objects, such as materials, production orders, or resources.
    2. Configuration Issues: There may be configuration settings in the SAP system that are not set up correctly, leading to the system ignoring dependencies.
    3. Data Inconsistencies: Inconsistent or incomplete master data (like BOMs, routing, or resource data) can cause the system to ignore dependencies.
    4. Planning Parameters: Incorrect planning parameters or settings in the MRP configuration can lead to this error.
    5. Resource Availability: If the required resources are not available or are blocked, the system may ignore dependencies to proceed with allocation.

    Solutions:

    1. Check Dependencies: Review the dependencies of the objects involved. Ensure that all necessary dependencies are correctly defined in the system.
    2. Review Configuration: Check the configuration settings related to MRP, production planning, and object allocation. Ensure that they are set up correctly to consider dependencies.
    3. Master Data Review: Verify the master data for the materials, BOMs, and routing. Ensure that all relevant data is complete and accurate.
    4. Adjust Planning Parameters: Review and adjust the planning parameters in the MRP settings to ensure that dependencies are considered during allocation.
    5. Resource Availability Check: Ensure that all required resources are available and not blocked. If resources are unavailable, consider rescheduling or reallocating tasks.
    6. Consult SAP Notes: Check for any relevant SAP Notes or updates that may address this specific error or provide additional guidance.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like MD04 (Stock/Requirements List) or CO02 (Change Production Order) to analyze the situation further.
    • SAP Help Documentation: Refer to the official SAP documentation for detailed information on MRP and object allocation processes.
    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered similar issues.

    If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant