How To Fix DMCLG893 - Scope has not been done for project &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DMCLG - DMC Tool Development

  • Message number: 893

  • Message text: Scope has not been done for project &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DMCLG893 - Scope has not been done for project &1 ?
    The SAP error message DMCLG893, which states "Scope has not been done for project &1," typically occurs in the context of project management or project system modules within SAP. This error indicates that the necessary scope definition or planning has not been completed for the specified project.
    
    Cause: Incomplete Project Setup: The project may not have been fully defined or set up in the system. This includes missing scope definitions, work breakdown structures (WBS), or other essential project planning elements. Missing Authorizations: The user may not have the necessary authorizations to view or modify the project scope.
    Configuration Issues: There may be configuration issues in the project management module that prevent the scope from being recognized or processed correctly. Data Inconsistencies: There could be inconsistencies in the data related to the project, such as missing entries in related tables.
    Solution: Check Project Definition: Ensure that the project has been fully defined. This includes verifying that all necessary

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker