Do you have any question about this error?
Message type: E = Error
Message class: DIWP1 - Revision Planning
Message number: 162
Message text: Order &1 is MEB-controlled and assigned revision &2 &3 is not released
The order has the system status MEB-controlled (MEBS) and is controlled
by the Maintenance Event Builder.
The assigned revision has not been released yet.
The order cannot be released.
The assigned revision must be released first, and then the order.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
DIWP1162
- Order &1 is MEB-controlled and assigned revision &2 &3 is not released ?The SAP error message DIWP1162 indicates that a specific order (denoted by &1) is MEB-controlled (Material Execution Batch-controlled) and is assigned a revision (denoted by &2) that has not been released (denoted by &3). This error typically arises in the context of production orders, batch management, or material management within SAP.
Cause:
- MEB Control: The order is set to be managed under Material Execution Batch (MEB) control, which means it requires specific revisions to be released before it can be processed.
- Revision Not Released: The revision associated with the order has not been released, which prevents any operations from being performed on that order.
- Configuration Issues: There may be configuration settings in the system that are not aligned with the requirements for MEB-controlled orders.
Solution:
Release the Revision:
- Navigate to the relevant transaction in SAP (such as
C223
for changing the revision orC202
for releasing the revision).- Check the status of the revision assigned to the order and release it if it is not already released.
Check Order Settings:
- Review the settings of the order to ensure that it is correctly configured for MEB control.
- Ensure that all necessary prerequisites for the order are met.
Consult Documentation:
- Refer to the SAP documentation or help files related to MEB control and revisions to understand the specific requirements and processes.
User Authorization:
- Ensure that the user attempting to release the revision has the necessary authorizations to perform this action.
Contact Support:
- If the issue persists after attempting the above solutions, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
C223
, C202
, and others that may be used to manage revisions and orders.By following these steps, you should be able to resolve the DIWP1162 error and proceed with your order processing in SAP.
Get instant SAP help. Start your 7-day free trial now.
DIWP1161
Message was written to the log, review log for details
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DIWP1160
Warning was output during assignment of network &1 activity &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DIWP1163
Assignment of network &1 activity &2 to order &3 prohibited
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DIWP1164
Main work center and plant are missing on network &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.