How To Fix DIWP1152 - Orders of revision could not be scheduled


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DIWP1 - Revision Planning

  • Message number: 152

  • Message text: Orders of revision could not be scheduled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DIWP1152 - Orders of revision could not be scheduled ?

    The SAP error message DIWP1152, which states "Orders of revision could not be scheduled," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system was unable to schedule a specific order due to various potential issues. Here are some common causes, solutions, and related information for this error:

    Causes:

    1. Capacity Constraints: The work center may not have enough capacity available to schedule the order. This can happen if the work center is overloaded with other orders or if the available capacity is not correctly defined.

    2. Missing Master Data: Required master data such as routing, bill of materials (BOM), or work center definitions may be incomplete or missing.

    3. Scheduling Parameters: Incorrect scheduling parameters or settings in the production order or in the planning configuration can lead to scheduling failures.

    4. Order Status: The order may be in a status that does not allow it to be scheduled (e.g., if it is already completed or technically closed).

    5. Date Constraints: The start or finish dates of the order may be outside the permissible range defined in the scheduling settings.

    6. Resource Availability: Resources required for the order may not be available due to maintenance, holidays, or other scheduling conflicts.

    Solutions:

    1. Check Capacity: Review the capacity of the work center to ensure that it can accommodate the order. You can do this by using transaction codes like CM01 (Capacity Planning) or CM21 (Capacity Leveling).

    2. Review Master Data: Ensure that all necessary master data (routing, BOM, work centers) is complete and correctly configured. Use transaction codes like CA03 (Display Routing) and CS03 (Display BOM) to verify.

    3. Adjust Scheduling Parameters: Check the scheduling parameters in the production order and adjust them if necessary. This can include lead times, float times, and other relevant settings.

    4. Check Order Status: Verify the status of the order to ensure it is eligible for scheduling. If the order is in a non-schedulable status, you may need to change its status.

    5. Review Date Settings: Ensure that the start and finish dates of the order are within the allowed range. Adjust the dates if necessary.

    6. Resource Management: Check the availability of resources and resolve any conflicts that may prevent scheduling. This may involve rescheduling other orders or adjusting maintenance plans.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO01 (Create Production Order), CO02 (Change Production Order), and CO03 (Display Production Order) for managing production orders.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP Notes can provide specific guidance or fixes for known problems.
    • Documentation: Review SAP documentation or help files related to production planning and scheduling for additional insights and best practices.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author