How To Fix DIWP1110 - Select one assigned and one unassigned network to reallocate a revision


DIWP1110 - Overview

  • Message type: E = Error

  • Message class: DIWP1 - Revision Planning

  • Message number: 110

  • Message text: Select one assigned and one unassigned network to reallocate a revision

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DIWP1110 - Select one assigned and one unassigned network to reallocate a revision ?
    The SAP error message DIWP1110 indicates that there is an issue with reallocating a revision in the system. Specifically, it suggests that you need to select one assigned and one unassigned network for the reallocation process. This error typically occurs in the context of project management or network planning within SAP, particularly in modules like SAP PS (Project System) or SAP PM (Plant Maintenance).
    
    Cause: The error arises when the system expects you to select a specific combination of networks for the reallocation of a revision. The requirements are: Assigned Network: This is a network that is currently linked to the project or task. Unassigned Network: This is a network that is not currently linked to any project or task. If you attempt to reallocate a revision without meeting these criteria, the system will trigger the DIWP1110 error.
    Solution: To resolve the DIWP1110 error, follow these steps: Identify Networks: Check the networks that are currently assigned to the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker