How To Fix DFS_ASSGMT_VAL112 - Rotation start date &1 cannot be before the operation start date &2.


DFS_ASSGMT_VAL112 - Overview

  • Message type: E = Error

  • Message class: DFS_ASSGMT_VAL - Messages used in Assignment Validations

  • Message number: 112

  • Message text: Rotation start date &1 cannot be before the operation start date &2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DFS_ASSGMT_VAL112 - Rotation start date &1 cannot be before the operation start date &2. ?
    The SAP error message DFS_ASSGMT_VAL112 indicates that there is a conflict between the rotation start date and the operation start date in a scheduling or planning context, typically related to maintenance or production planning. Specifically, the error states that the rotation start date cannot be earlier than the operation start date.
    
    Cause: Date Configuration: The rotation start date is set to a date that is earlier than the operation start date. This can happen due to incorrect data entry or misconfiguration in the scheduling settings. Planning Errors: During the planning phase, if the rotation is not aligned with the operation's timeline, it can lead to this error. Master Data Issues: The master data for the operation or rotation may not be correctly defined, leading to inconsistencies in the dates.
    Solution: Check Dates: Review the rotation start date and the operation start date. Ensure that the rotation start date is set to a date that is equal

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant