How To Fix DFS_ALLWNCPLAN006 - FE &1 is only valid from &2 to &3 and does not match the plan period.


DFS_ALLWNCPLAN006 - Overview

  • Message type: E = Error

  • Message class: DFS_ALLWNCPLAN - Allowance Plan

  • Message number: 006

  • Message text: FE &1 is only valid from &2 to &3 and does not match the plan period.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DFS_ALLWNCPLAN006 - FE &1 is only valid from &2 to &3 and does not match the plan period. ?
    The SAP error message DFS_ALLWNCPLAN006 indicates that there is a mismatch between the planning period of a specific plan and the time frame that is being referenced in your transaction. This error typically occurs in the context of planning and forecasting within SAP, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).
    
    Cause: The error message is triggered when: You are trying to use a plan (identified by &1) that is only valid for a specific period (from &2 to &3). The date or period you are trying to reference does not fall within the valid range of the plan.
    Solution: To resolve this error, you can take the following steps: Check the Plan Validity: Verify the validity dates of the plan you are trying to use. You can do this by navigating to the relevant planning area or configuration settings in SAP. Ensure that the date or period you are trying

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker