Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 514
Message text: Planning period was exceeded
The time fence was defined as lying between &V1& and &v2& in
Customizing for capacity planning. You tried to dispatch the
requirements in period &V3&. The period &V3&, however, lies outside the
time fence.
You should dispatch the requirements within the time fence or
change the time fence in the time profile in Customizing for capacity
planning.
Error message extract from SAP system. Copyright SAP SE.
CY514
- Planning period was exceeded ?The SAP error message CY514 ("Planning period was exceeded") typically occurs in the context of SAP's Production Planning (PP) or Controlling (CO) modules, particularly when dealing with planning activities in the Capacity Planning or Demand Management areas. This error indicates that the planning period defined in the system has been exceeded, meaning that the user is trying to perform planning activities outside the allowed time frame.
Causes:
- Planning Horizon Settings: The planning horizon may not be set correctly in the configuration, leading to restrictions on the planning period.
- Master Data Issues: The master data for the material or resource may not be correctly defined, which can affect the planning period.
- Incorrect Date Inputs: Users may be entering dates that fall outside the defined planning period.
- System Configuration: The system may have been configured to limit planning to a specific time frame, and the user is attempting to plan beyond that limit.
Solutions:
Check Planning Horizon Settings:
- Navigate to the configuration settings for the planning horizon in the relevant module (e.g., PP or CO).
- Adjust the planning horizon to include the required dates for planning.
Review Master Data:
- Ensure that the master data for the materials, resources, or production versions is correctly set up.
- Check the validity dates and planning parameters associated with the master data.
Validate Date Inputs:
- Ensure that the dates being entered for planning activities are within the defined planning horizon.
- If necessary, adjust the dates to fall within the allowed range.
Consult with SAP Basis or Functional Team:
- If the issue persists, consult with your SAP Basis or functional team to review system configurations and settings that may be affecting the planning period.
User Training:
- Provide training to users on the importance of adhering to the planning horizon and how to check the settings before performing planning activities.
Related Information:
By addressing the underlying causes and following the suggested solutions, you should be able to resolve the CY514 error and continue with your planning activities in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
CY513
Please select requirements elements for distribution display
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY512
Planning period was exceeded
What causes this issue? The planning period was defined from &V1& to &V2& in Customizing for capacity leveling. You tried to take the...
CY515
Place the cursor on a period or select a period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY516
Structures of the layout key & could not be saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.