How To Fix CY298 - No reqmts/caps exists or not relevant to finite scheduling


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 298

  • Message text: No reqmts/caps exists or not relevant to finite scheduling

  • Show details Hide details
  • What causes this issue?

    In the capacity availability check either no capacities were found or
    none were found that were relevant for finite scheduling or no capacity
    requirements were found.
    The possible causes are:
    no capacities have been assigned to the work centers checked
    in the capacities at the work centers checked the indicator
    <ls>Relevant to finite scheduling</> is not set. Thus the capacities
    can have an unlimited load.
    no capacity requirements exist for the order checked
    &System_response&
    The capacity availability is checked.

    How to fix this error?

    Assign capacities to the work centers affected by the order.
    Set the indicator <ls>Relevant to finite scheduling</> at the
    capacities in the work centers affected.
    Find out why no capacity requirements exist and, if possible, solve the
    problem.
    Carry out the capacity availability check again.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CY298 - No reqmts/caps exists or not relevant to finite scheduling ?

    The SAP error message CY298 indicates that there are no requirements or capacities available for finite scheduling in the context of production planning and control. This error typically arises when trying to perform finite scheduling in SAP, and it suggests that the system cannot find any relevant data to process the scheduling request.

    Causes of Error CY298

    1. Missing Requirements: There may be no production orders, planned orders, or other requirements defined for the material in question.
    2. Capacity Issues: The work center or production line may not have any available capacity defined for the time period being scheduled.
    3. Incorrect Configuration: The configuration settings for finite scheduling may not be set up correctly, leading to the system not recognizing the relevant requirements or capacities.
    4. Material Status: The material may be in a status that does not allow for scheduling (e.g., blocked, inactive).
    5. Date Issues: The scheduling date may fall outside the range of available capacities or requirements.

    Solutions to Error CY298

    1. Check Requirements:

      • Verify that there are valid production orders or planned orders for the material you are trying to schedule.
      • Ensure that the orders are not in a status that prevents scheduling (e.g., completed, canceled).
    2. Review Capacity Planning:

      • Check the work center or production line to ensure that there is available capacity for the time period you are trying to schedule.
      • Make sure that the capacity is correctly defined in the work center settings.
    3. Configuration Settings:

      • Review the configuration settings for finite scheduling in the SAP system. Ensure that the settings are appropriate for your production environment.
      • Check if the scheduling parameters are correctly set up in the relevant customizing transactions (e.g., OPPQ for production scheduling profiles).
    4. Material Status:

      • Check the status of the material in the material master. Ensure that it is active and not blocked for production.
    5. Date and Time Settings:

      • Ensure that the scheduling date is within the range of available capacities and requirements. Adjust the dates if necessary.
    6. Run Availability Check:

      • Perform an availability check for the material to see if there are any issues with stock levels or other constraints.

    Related Information

    • Transaction Codes: You may need to use transaction codes like MD04 (Stock/Requirements List), CO02 (Change Production Order), or CM01 (Capacity Planning) to investigate further.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Documentation: Review SAP documentation related to finite scheduling and capacity planning for more detailed guidance on configuration and troubleshooting.

    By following these steps, you should be able to identify the root cause of the CY298 error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker