How To Fix CY149 - The selected value has no capacity requirements


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 149

  • Message text: The selected value has no capacity requirements

  • Show details Hide details
  • What causes this issue?

    The value selected contains no capacity requirement. As a result no
    pegged requirement can be displayed.

    How to fix this error?

    Place the cursor on another column.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CY149 - The selected value has no capacity requirements ?

    The SAP error message CY149: The selected value has no capacity requirements typically occurs in the context of capacity planning and production scheduling within SAP. This error indicates that the system cannot find any capacity requirements for the selected value, which could be a production order, a planned order, or a similar entity.

    Causes:

    1. No Capacity Requirements Defined: The selected order or operation does not have any capacity requirements defined. This could happen if the order is not properly set up or if the routing does not include operations that require capacity.

    2. Incorrect Order Status: The order might be in a status that does not allow for capacity planning, such as being in a "completed" or "cancelled" state.

    3. Missing or Incorrect Routing: The routing for the material might be missing or incorrectly defined, leading to no capacity being calculated.

    4. Capacity Planning Settings: The settings for capacity planning in the configuration might not be set up correctly, leading to the system not recognizing the capacity requirements.

    5. Resource Availability: The resources (work centers) associated with the order may not have been set up correctly or may not be available for the selected time period.

    Solutions:

    1. Check Order and Routing: Verify that the production order or planned order is correctly set up and that the routing associated with it includes operations that require capacity.

    2. Review Work Center Settings: Ensure that the work centers involved in the routing are correctly defined and have the necessary capacity settings.

    3. Check Order Status: Make sure that the order is in a status that allows for capacity planning. If it is completed or cancelled, you may need to create a new order.

    4. Capacity Planning Configuration: Review the configuration settings for capacity planning in the system to ensure they are set up correctly.

    5. Recreate the Order: If the order is not set up correctly, consider deleting and recreating it to ensure that all necessary data is included.

    6. Consult Documentation: Refer to SAP documentation or help resources for specific details related to capacity planning and the error message.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like CO02 (Change Production Order) or MD04 (Stock/Requirements List) to investigate the order and its requirements.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Forums: Consider visiting SAP community forums or user groups for additional insights and solutions from other users who may have encountered the same issue.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant