How To Fix CV190 - ----------- Update PLVK and PLMB -----------------------------


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CV - CIM messages: Update

  • Message number: 190

  • Message text: ----------- Update PLVK and PLMB -----------------------------

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CV190 - ----------- Update PLVK and PLMB ----------------------------- ?
    The SAP error message CV190, which states "Update PLVK and PLMB," typically relates to issues with the update of the planning data in the SAP system, particularly in the context of the SAP Production Planning (PP) module or similar areas where planning data is managed.
    
    Cause: Data Inconsistency: The error often arises due to inconsistencies in the planning data, such as missing or incorrect entries in the PLVK (Planning Data for Sales and Operations Planning) or PLMB (Planning Data for Material Requirements Planning) tables. Locking Issues: If another process is currently updating the same data, it may lead to a lock situation, preventing the update from completing.
    Configuration Issues: Incorrect configuration settings in the planning parameters or master data can also lead to this error. Authorization Issues: Lack of proper authorizations for the user trying to perform the update can also trigger this error.
    Solution: Check Data Consistency: Use transaction codes like SE11 or SE16 to check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author