How To Fix /CUM/MSG551 - Status of construction measure & does not allow allocation


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CUM/MSG -

  • Message number: 551

  • Message text: Status of construction measure & does not allow allocation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CUM/MSG551 - Status of construction measure & does not allow allocation ?

    The SAP error message /CUM/MSG551 typically indicates that there is an issue with the status of a construction measure (or project) that prevents the allocation of costs or resources. This error is often encountered in the context of project system (PS) or construction management modules within SAP.

    Cause:

    The error message usually arises due to one of the following reasons:

    1. Status of the Construction Measure: The construction measure (or project) may be in a status that does not allow for cost allocation. For example, it could be in a "locked" status or a status that is not yet approved for cost postings.

    2. Project Definition Issues: There may be issues with the project definition or structure, such as missing or incorrect settings that prevent allocations.

    3. Authorization Issues: The user may not have the necessary authorizations to perform allocations on the specified construction measure.

    4. Budget Constraints: If the project is subject to budgetary controls, it may be that the budget has been exceeded or is not available for the allocation.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Project Status: Review the status of the construction measure in the project system. Ensure that it is in a status that allows for cost allocations. You may need to change the status to "Released" or "Approved" if it is currently locked.

    2. Review Project Definition: Verify that the project definition is complete and correct. Check for any missing elements or settings that may be causing the issue.

    3. Authorization Check: Ensure that the user attempting the allocation has the necessary authorizations. If not, contact your SAP security administrator to grant the required permissions.

    4. Budget Review: Check the budget assigned to the construction measure. If the budget is exceeded, you may need to adjust the budget or reallocate costs accordingly.

    5. Consult Documentation: Refer to SAP documentation or your organization's internal guidelines for specific procedures related to project status and cost allocation.

    6. Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJ02 (Change Project) to manage project statuses and allocations.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • Training and Documentation: Ensure that users involved in project management are trained on the proper procedures for managing project statuses and allocations in SAP.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker