Message type: E = Error
Message class: /CUM/CONMS -
Message number: 021
Message text: Documents are linked. Construction measure & cannot be deleted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/CUM/CONMS021
- Documents are linked. Construction measure & cannot be deleted ?The SAP error message
/CUM/CONMS021 Documents are linked. Construction measure & cannot be deleted
typically occurs in the context of construction project management within SAP, particularly when dealing with construction measures (or construction projects) that have associated documents or transactions.Cause:
This error indicates that the construction measure you are trying to delete is linked to other documents or transactions in the system. These links can include:
Because of these links, the system prevents the deletion of the construction measure to maintain data integrity and avoid orphaned records.
To resolve this error, you can follow these steps:
Identify Linked Documents:
SE16N
or SE11
to check the database tables related to construction measures (e.g., CUM_CONSTRUCTION_MEASURE
, CUM_DOCUMENTS
, etc.) to find out which documents are linked to the construction measure you are trying to delete.Remove Links:
Check for Dependencies:
Delete the Construction Measure:
Consult Documentation:
CUM1
(for creating construction measures), CUM2
(for changing), and CUM3
(for displaying).If the problem persists after following these steps, it may be beneficial to consult with your SAP Basis or functional team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
/CUM/CONMS020
Design & is assigned. You cannot delete construction measure &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS019
Order & is assigned. You cannot delete construction measure &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS022
Master order & is not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CUM/CONMS023
Notification & is not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.