Do you have any question about this error?
Message type: E = Error
Message class: CS - Logistics Customizing
Message number: 023
Message text: HR layer & does not exist. Delete
The daily work schedule &v1& has been deleted in the HR application.
Create the daily work schedule &v1& again or delete the reference to
HR.
Error message extract from SAP system. Copyright SAP SE.
CS023
- HR layer & does not exist. Delete ?The SAP error message CS023 typically indicates that there is an issue with the configuration of a material or a bill of materials (BOM) in the SAP system. The specific message "HR layer & does not exist. Delete?" suggests that the system is unable to find a specific layer or component in the hierarchical structure of the BOM or material master.
Cause:
- Missing Data: The specified HR (Hierarchical) layer or component may not exist in the system. This could be due to data not being created or deleted inadvertently.
- Incorrect Configuration: There may be an issue with how the BOM or material is configured, leading to references to non-existent layers.
- Transport Issues: If the configuration was transported from one system to another (e.g., from development to production), there may have been issues during the transport process that led to missing components.
- Versioning Issues: If there are multiple versions of a BOM or material, the system may be referencing an outdated or incorrect version.
Solution:
- Check BOM/Material Configuration: Verify the BOM or material configuration in the system. Ensure that all components and layers are correctly defined and exist in the system.
- Delete or Correct References: If the HR layer is indeed missing and not needed, you can choose to delete the reference. If it is needed, you may need to recreate it.
- Transport Validation: If the issue arose after a transport, check the transport logs for errors and ensure that all necessary objects were transported correctly.
- Consult Documentation: Review any relevant documentation or configuration guides to ensure that the setup aligns with best practices.
- SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide guidance on similar issues.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), and CS03
(Display BOM) to manage BOMs.MM03
to display the material master and check for any inconsistencies.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
CS022
Break &1 does not exist. Delete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CS021
Maintain a planning scenario
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CS025
Scheduling indicator &1 not allowed.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CS026
Process control key &1 is not intended for order category &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.