Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix CRM_PS_SCD031 - Eligibility status unknown for period &1 - &2


CRM_PS_SCD031 - Overview

  • Message type: E = Error

  • Message class: CRM_PS_SCD -

  • Message number: 031

  • Message text: Eligibility status unknown for period &1 - &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CRM_PS_SCD031 - Details

  • The SAP error message CRM_PS_SCD031, which states "Eligibility status unknown for period &1 - &2," typically occurs in the context of project system (PS) or customer relationship management (CRM) modules when there is an issue with the eligibility status of a resource or a project during a specific time period.
    
    Cause: Missing Data: The eligibility status for the specified period may not be defined in the system. This can happen if the relevant data has not been maintained or if there are gaps in the configuration. Incorrect Time Period: The time period specified in the error message may not align with the periods defined in the system for the resource or project. Resource Availability: The resource may not be available for the specified time period due to scheduling conflicts or other constraints.
    Configuration Issues: There may be issues with the configuration of the project or resource management settings in the system.
    Solution: Check Eligibility Data: Verify that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CRM_PS_SCD031 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker