How To Fix CRM_POOL_LINK_API104 - The linkage start date is after the contract end date


CRM_POOL_LINK_API104 - Overview

  • Message type: E = Error

  • Message class: CRM_POOL_LINK_API - Messages API Pool Linkage

  • Message number: 104

  • Message text: The linkage start date is after the contract end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRM_POOL_LINK_API104 - The linkage start date is after the contract end date ?
    The SAP error message CRM_POOL_LINK_API104 indicates that there is an issue with the linkage of a contract in the SAP Customer Relationship Management (CRM) system. Specifically, the error states that the linkage start date is after the contract end date, which means that the system is trying to create or modify a linkage that is not valid because the start date of the linkage occurs after the contract has already ended.
    
    Cause: Incorrect Dates: The linkage start date has been set incorrectly, possibly due to user input errors or system defaults. Contract Validity: The contract associated with the linkage has a defined end date, and the linkage is being attempted outside of this valid period. Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in the date formats or values.
    Solution: Check Dates: Review the linkage start date and the contract end date. Ensure that the linkage start date is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant