How To Fix CRM_FS_MASS_CHANGE006 - Contract was changed after scheduling for mass run


CRM_FS_MASS_CHANGE006 - Overview

  • Message type: E = Error

  • Message class: CRM_FS_MASS_CHANGE - Messages for Mass Change Processes

  • Message number: 006

  • Message text: Contract was changed after scheduling for mass run

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRM_FS_MASS_CHANGE006 - Contract was changed after scheduling for mass run ?
    The SAP error message CRM_FS_MASS_CHANGE006 indicates that a contract was modified after it was scheduled for a mass run. This typically occurs in the context of mass processing in SAP CRM (Customer Relationship Management), where multiple contracts are being updated or processed in a batch.
    
    Cause: The error is triggered when: A contract that is part of a scheduled mass change operation has been altered (e.g., updated, deleted, or otherwise modified) after the mass change job was initiated. This can happen if multiple users are working on the same contracts simultaneously, or if there are background processes that modify the contracts while the mass run is in progress.
    Solution: To resolve this error, you can take the following steps: Check for Changes: Review the contracts that are part of the mass run to see if any changes were made after the scheduling. You can do this by checking the change logs or the status of the contracts. Re-schedule

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant