Message type: E = Error
Message class: CRM_FS_CHANGE - Messages for Changes to Leases
Message number: 054
Message text: Mass data for ID &1 could not be successfully scheduled
The mass processing that you started could not be successfully
scheduled.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can repeat the action by using the mass change workbench.
Error message extract from SAP system. Copyright SAP SE.
CRM_FS_CHANGE054
- Mass data for ID &1 could not be successfully scheduled ?The SAP error message CRM_FS_CHANGE054 indicates that there was an issue with scheduling mass data changes for a specific ID in the CRM system. This error typically arises in the context of mass data processing, such as when trying to update or change multiple records at once.
Cause:
- Data Locking: The ID you are trying to process may be locked by another transaction or user, preventing the mass data change from being scheduled.
- Insufficient Authorizations: The user executing the mass data change may not have the necessary authorizations to perform the operation.
- System Performance Issues: If the system is under heavy load or if there are performance issues, the scheduling of mass data changes may fail.
- Configuration Issues: There may be configuration settings in the CRM system that are not set up correctly, leading to scheduling failures.
- Data Integrity Issues: The data being processed may have integrity issues, such as missing required fields or invalid data formats.
Solution:
- Check Locks: Verify if the ID is locked by another user or process. You can use transaction codes like SM12 to check for locks and release them if necessary.
- Review Authorizations: Ensure that the user has the appropriate authorizations to perform mass data changes. You can check this using transaction SU53 or by consulting with your security team.
- Monitor System Performance: Check the system performance and load. If the system is slow, consider scheduling the mass data change during off-peak hours.
- Review Configuration: Check the configuration settings related to mass data processing in the CRM system. Ensure that all necessary settings are correctly configured.
- Validate Data: Before attempting the mass data change, validate the data to ensure that it meets all required criteria and formats. You can use transaction codes like SE11 to check the data structure.
- Retry the Operation: After addressing the above issues, try to schedule the mass data change again.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or CRM support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CRM_FS_CHANGE053
Mass data for ID &1 was successfully scheduled
What causes this issue? The mass processing that you started was successfully scheduled.System Response The system issues an error message and will ...
CRM_FS_CHANGE052
Mass data for ID &1 could not be successfully processed
What causes this issue? The mass data for the named ID could not be successfully processed.System Response The system issues an error message and wi...
CRM_FS_CHANGE055
Enter either term or end-of-lease
What causes this issue? To execute the change process, you must enter either the lease term or the contract end date.How to fix this error? Delete o...
CRM_FS_CHANGE056
Error while changing financing views at item level
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.