How To Fix CRM_BUPA_HIERARCHY031 - Validity of lower-level node &1 is not in validity period you specified


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CRM_BUPA_HIERARCHY - CRM BP Group Hierarchy

  • Message number: 031

  • Message text: Validity of lower-level node &1 is not in validity period you specified

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRM_BUPA_HIERARCHY031 - Validity of lower-level node &1 is not in validity period you specified ?
    The SAP error message CRM_BUPA_HIERARCHY031 indicates that there is an issue with the validity period of a lower-level node in a business partner hierarchy. Specifically, it means that the validity of the lower-level node (in this case, identified by &1) does not fall within the validity period that you have specified for the higher-level node.
    
    Cause: Validity Period Mismatch: The lower-level node has a validity period that does not overlap with the validity period of the higher-level node. This can happen if the lower-level node is set to be valid for a different time frame than what is being defined for the higher-level node. Incorrect Date Entry: The dates entered for the validity period of the higher-level node may be incorrect or not aligned with the dates of the lower-level node. Hierarchy
    Configuration Issues: There may be issues in the configuration of the business partner hierarchy that lead to this inconsistency.
    Solution: Check Validity Periods: Review

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant