How To Fix CR258 - A capacity with number & is already assigned to the resource


CR258 - Overview

  • Message type: E = Error

  • Message class: CR - (1,099) Work Center; (100,200) Capacity

  • Message number: 258

  • Message text: A capacity with number & is already assigned to the resource

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CR258 - A capacity with number & is already assigned to the resource ?
    The SAP error message CR258 indicates that a capacity with a specific number is already assigned to a resource. This typically occurs in the context of capacity planning and resource management within SAP, particularly in modules like SAP Production Planning (PP) or SAP Project System (PS).
    
    Cause: Duplicate Assignment: The most common cause of this error is that the capacity you are trying to assign to a resource is already assigned to another resource or the same resource.
    Configuration Issues: There may be configuration issues in the capacity planning settings that lead to conflicts in capacity assignments. Data Integrity Issues: There could be inconsistencies in the master data, such as the resource or capacity master records.
    Solution: Check Existing Assignments: Go to the capacity planning transaction (e.g., CM01, CM21) and check the existing assignments for the capacity number in question. Ensure that it is not already assigned to another resource. Remove Duplicate Assignments: If you find that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant