How To Fix CR228 - Resource capacity selected is basis for scheduling


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CR - (1,099) Work Center; (100,200) Capacity

  • Message number: 228

  • Message text: Resource capacity selected is basis for scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CR228 - Resource capacity selected is basis for scheduling ?

    The SAP error message CR228 ("Resource capacity selected is basis for scheduling") typically occurs in the context of capacity planning and scheduling within SAP's production planning (PP) or project system (PS) modules. This error indicates that the resource capacity you are trying to use for scheduling is not suitable for the operation or task you are attempting to schedule.

    Cause:

    1. Resource Configuration: The resource may not be configured correctly in the system. It might be set up as a capacity resource but is being treated as a non-capacity resource in the scheduling process.
    2. Capacity Planning Settings: The settings for capacity planning may not align with the requirements of the operation or task. For example, the resource might not have the necessary capacity defined for the operation.
    3. Scheduling Parameters: The scheduling parameters for the operation may not be compatible with the resource's capacity settings.
    4. Resource Availability: The resource may not be available for the time period you are trying to schedule, or it may be overbooked.

    Solution:

    1. Check Resource Configuration: Verify the configuration of the resource in the SAP system. Ensure that it is set up correctly as a capacity resource and that all relevant parameters are defined.
    2. Review Capacity Planning Settings: Go to the capacity planning settings and ensure that the resource has the necessary capacity defined for the operations you are trying to schedule.
    3. Adjust Scheduling Parameters: Review the scheduling parameters for the operation and ensure they are compatible with the resource's capacity settings. This may involve adjusting lead times, setup times, or other relevant parameters.
    4. Check Resource Availability: Ensure that the resource is available for the time period you are trying to schedule. You can check the resource's calendar and availability settings.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on capacity planning and scheduling in your version of SAP.

    Related Information:

    • Transaction Codes: You may use transaction codes like CM01 (Capacity Overview) or CM21 (Capacity Planning) to analyze resource capacities and availability.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Forums: Consider visiting SAP community forums or user groups for additional insights and solutions from other users who may have encountered the same issue.

    If the problem persists after checking these areas, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PP or PS modules for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant