Do you have any question about this error?
Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 143
Message text: Insert day & in its proper place
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CR143
- Insert day & in its proper place ?The SAP error message CR143 "Insert day & in its proper place" typically occurs in the context of scheduling or planning activities, particularly when dealing with dates in a planning table or calendar. This error indicates that there is an issue with the way dates are being entered or processed in the system.
Cause:
- Incorrect Date Format: The date may not be in the expected format, leading to confusion in the system.
- Invalid Date Entry: The day being entered may not correspond to a valid date in the context of the scheduling or planning.
- Missing Data: There may be missing information that is required for the system to process the date correctly.
- Configuration Issues: There could be issues with the configuration of the planning or scheduling module that is causing the error.
Solution:
- Check Date Format: Ensure that the date is entered in the correct format as expected by the system (e.g., DD/MM/YYYY or MM/DD/YYYY).
- Validate Date Entries: Make sure that the day being entered is valid for the month and year (e.g., not entering February 30).
- Review Required Fields: Check if there are any mandatory fields that need to be filled out before entering the date.
- Consult Documentation: Refer to SAP documentation or help files for specific guidelines on date entry in the module you are working with.
- Configuration Review: If the issue persists, consult with your SAP Basis or configuration team to review the settings related to the planning or scheduling module.
- SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that might address this specific error.
Related Information:
CR01
(Create Work Center), CR02
(Change Work Center), or others related to planning.If the problem continues after trying these solutions, it may be beneficial to escalate the issue to your SAP support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
CR142
Day & is outside cycle length &
What causes this issue? You attempted to expand your shift sequence and have exceeded the cycle duration.System Response The system only accepts cyc...
CR141
You cannot delete the first interval
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR144
Shift & & must be sorted before inserting
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR145
Shift start & is before finish of previous shift &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.