Do you have any question about this error?
Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 124
Message text: Capacity & plant & category & currently being processed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CR124
- Capacity & plant & category & currently being processed ?The SAP error message CR124 typically indicates that there is an issue with capacity planning in the context of production planning and control. This error message usually arises when there is a conflict or issue with the capacity of a work center, plant, or production category that is currently being processed.
Cause:
- Capacity Overload: The work center may be overloaded with more planned orders than it can handle within the available capacity.
- Incorrect Configuration: There may be incorrect settings in the work center or routing that do not align with the production requirements.
- Capacity Planning Issues: The capacity planning data may not be updated or may contain errors, leading to discrepancies in available capacity.
- Locked Resources: The resources or work centers may be locked due to maintenance or other activities, preventing new orders from being processed.
- Incorrect Plant or Category Assignment: The plant or production category assigned to the order may not match the available capacity.
Solution:
- Check Capacity Utilization: Review the capacity utilization of the work center to ensure it is not overloaded. You can do this using transaction codes like CM01 (Capacity Overview) or CM21 (Capacity Leveling).
- Adjust Production Orders: If there are too many production orders scheduled, consider rescheduling or adjusting the orders to balance the workload.
- Update Capacity Data: Ensure that the capacity data for the work center is up to date. This includes checking the available capacity, shifts, and any planned maintenance.
- Review Work Center Configuration: Check the configuration of the work center and routing to ensure they are set up correctly and align with the production requirements.
- Unlock Resources: If resources are locked, coordinate with the relevant teams to unlock them or adjust the scheduling accordingly.
- Check Plant and Category Assignments: Verify that the plant and production category assigned to the order are correct and that they have the necessary capacity.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
CR123
No reference available capacity maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR122
An available capacity has already been maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR125
The valid interval to & is overlapped and deleted
What causes this issue? You have entered a validity period for the new interval which overlaps an existing interval.System Response The system issue...
CR126
No authorization to & a capacity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.