How To Fix CR069 - Work ctr & plant & not assigned to hierarchy & in plant &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CR - (1,099) Work Center; (100,200) Capacity

  • Message number: 069

  • Message text: Work ctr & plant & not assigned to hierarchy & in plant &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CR069 - Work ctr & plant & not assigned to hierarchy & in plant & ?

    The SAP error message CR069 indicates that a work center and plant combination is not assigned to a hierarchy in the specified plant. This error typically arises in the context of production planning and control, where work centers are essential for defining where production activities take place.

    Cause:

    1. Missing Hierarchical Assignment: The work center is not assigned to a valid hierarchy in the specified plant. This can happen if the work center was created but not properly linked to the required hierarchy.
    2. Configuration Issues: There may be issues in the configuration settings of the work center or the plant, leading to the absence of the necessary hierarchy assignment.
    3. Data Migration Issues: If data was migrated from another system or if there were changes in the organizational structure, the hierarchy assignments may not have been updated accordingly.

    Solution:

    1. Check Work Center Configuration:

      • Go to the transaction code CR02 (Change Work Center) and verify the details of the work center in question.
      • Ensure that the work center is assigned to the correct plant and that it has the necessary hierarchy assignments.
    2. Assign Work Center to Hierarchy:

      • Use transaction code CR03 (Display Work Center) to check the hierarchy assignment.
      • If the work center is not assigned to a hierarchy, you can assign it using the appropriate transaction code or configuration settings.
    3. Review Hierarchy Settings:

      • Navigate to the configuration settings for work centers and check the hierarchy settings in the relevant plant.
      • Ensure that the hierarchy structure is correctly defined and that the work center is included in the hierarchy.
    4. Consult Documentation:

      • Review SAP documentation or help files related to work center configuration and hierarchy assignments for additional guidance.
    5. Check for Transport Issues:

      • If the issue arose after a transport request, ensure that all necessary objects were transported correctly and that no dependencies were missed.
    6. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes:
      • CR01: Create Work Center
      • CR02: Change Work Center
      • CR03: Display Work Center
      • CR04: Work Center Hierarchy
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • Documentation: Refer to the SAP Help Portal for detailed information on work center configuration and hierarchy management.

    By following these steps, you should be able to resolve the CR069 error and ensure that your work centers are properly assigned to the necessary hierarchies in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker