Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 048
Message text: A capacity with category & is already assigned
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CR048
- A capacity with category & is already assigned ?The SAP error message CR048 indicates that there is an attempt to assign a capacity (such as a work center or resource) that is already assigned to another capacity category. This typically occurs in the context of capacity planning and management within SAP's Production Planning (PP) module.
Cause: The error occurs when: You are trying to assign a capacity (e.g., a work center) to a category (e.g., a production line, machine, or resource) that it is already assigned to another category. There may be a configuration issue where the same capacity is mistakenly set up to be used in multiple categories, leading to conflicts. The capacity might be locked or in use by another process, preventing it from being reassigned.
Solution: To resolve the CR048 error, you can take the following steps: Check Existing Assignments: Go to the capacity planning transaction (e.g., CR02 for changing work centers) and check the existing assignments for the capacity in question. Ensure that the
Get instant SAP help. Sign up for our Free Essentials Plan.
CR047
Data must still be maintained
What causes this issue? You have not yet edited this screen.How to fix this error? You can edit the data now. If you do not want to edit the data no...
CR046
Data should still be maintained
What causes this issue? You have not yet edited this screen.How to fix this error? You can edit the data now. If you do not want to edit the data no...
CR049
Controlling area does not exist for plant &
What causes this issue? You selected a <DS:GLOS.controlling area> controlling area</> which is not assigned to plant &V1&. Contro...
CR050
A lock was set for work center & plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.