Do you have any question about this error?
Message type: E = Error
Message class: CPWB - General Workbench Messages
Message number: 169
Message text: &1 of &2 operations have been changed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPWB169
- &1 of &2 operations have been changed ?The SAP error message CPWB169 indicates that certain operations in a production order or a process order have been changed. This message typically arises in the context of production planning and control, particularly when dealing with routing or work center changes.
Cause:
- Changes in Routing or Work Center: The error often occurs when there are modifications to the routing or work center that affect the operations of a production order. This could be due to updates in the master data or changes made by users.
- Order Status: If the production order is in a status that does not allow for certain changes, this error may be triggered.
- Concurrent Changes: If multiple users are trying to change the same order or routing simultaneously, it can lead to inconsistencies and trigger this error.
Solution:
- Review Changes: Check the changes made to the routing or work center. You can do this by reviewing the change logs or the history of the production order.
- Recheck Order Status: Ensure that the production order is in a status that allows for the changes you are trying to make. If necessary, change the status of the order to allow for updates.
- Reprocess the Order: If the operations have been changed, you may need to reprocess the order or reassign the operations as necessary.
- Locking Mechanism: Ensure that no other users are making changes to the same order at the same time. If necessary, coordinate with your team to avoid concurrent modifications.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CPWB168
Task list header remains unchanged
What causes this issue? You want to change a task list header with the help of a mass change. However, the data that you have entered is inconsistent...
CPWB167
Inspection characteristic remains unchanged
What causes this issue? You want to change an inspection chracteristic with the help of a mass change. However, the data that you have entered for th...
CPWB170
Only locked operations can be classified
What causes this issue? You want to change an operation, but have not yet locked it.System Response The system does not allow you to goto operation ...
CPWB171
Line hierarchy and work center are not defined in the header
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.