Do you have any question about this error?
Message type: E = Error
Message class: CPWB - General Workbench Messages
Message number: 059
Message text: There is no corresponding material allocation in the worklist
There is no material assignment in the worklist that fulfills your
entries in the context.
You cannot process the material assignment.
Change your entries in the context and choose <zh>Enter</>.
Error message extract from SAP system. Copyright SAP SE.
CPWB059
- There is no corresponding material allocation in the worklist ?The SAP error message CPWB059, which states "There is no corresponding material allocation in the worklist," typically occurs in the context of production planning and control, particularly when working with the Capacity Planning Workbench (CPWB) or similar modules. This error indicates that the system cannot find a material allocation that matches the criteria specified in your worklist.
Causes:
- Missing Material Allocation: The most common cause is that there is no material allocation created for the specific production order or planned order you are trying to work with.
- Incorrect Selection Criteria: The selection criteria used to filter the worklist may not match any existing allocations.
- Data Synchronization Issues: There may be a delay or issue in data synchronization between different modules or systems, leading to the absence of expected allocations.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to view certain allocations.
- Configuration Issues: Incorrect configuration in the system settings related to capacity planning or material allocation can also lead to this error.
Solutions:
- Check Material Allocation: Verify if the material allocation exists for the production order or planned order in question. You can do this by checking the relevant production or planned order details.
- Adjust Selection Criteria: Review and adjust the selection criteria in your worklist to ensure it matches the existing allocations.
- Refresh Data: If you suspect a synchronization issue, try refreshing the data or logging out and back into the system to see if the allocations appear.
- Review Authorizations: Ensure that you have the necessary authorizations to view the material allocations. Consult with your SAP security team if needed.
- Consult Configuration Settings: If you suspect a configuration issue, consult with your SAP Basis or configuration team to review the settings related to capacity planning and material allocation.
- Check for Errors in Related Processes: Investigate if there are any errors in related processes (e.g., production order creation, material master data) that might be affecting the allocation.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant for further investigation.
Get instant SAP help. Start your 7-day free trial now.
CPWB058
There is no corresponding sequence in the worklist
What causes this issue? There is no sequence in the worklist that fulfills your entries in the context.System Response You cannot process the sequen...
CPWB057
There is no corresponding operation in the worklist
What causes this issue? There is no operation in the worklist that fulfills your entries in the context.System Response You cannot edit the operatio...
CPWB060
Enter operation ID
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPWB061
Enter the plant
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.