Do you have any question about this error?
Message type: E = Error
Message class: CPE - Commodity Pricing Engine
Message number: 104
Message text: Define either period determination or fixed period
In the period determination rule, attributes for determining dates for
a flexible period, and dates for determining a fixed period were
defined.
A period determination rule can only be defined with either a fixed
period or with dates for a flexible period.
Check your input data and define only one kind of period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CPE104
- Define either period determination or fixed period ?The SAP error message CPE104, which states "Define either period determination or fixed period," typically occurs in the context of configuring the Controlling (CO) module, particularly when dealing with Cost Planning or Profitability Analysis (CO-PA). This error indicates that the system requires a definition for how periods are determined for planning purposes, but neither a period determination method nor a fixed period has been set.
Cause:
Missing Configuration: The error arises when the necessary configuration for period determination is not set up in the system. This could be due to:
- Not defining a period determination strategy in the relevant configuration settings.
- Not specifying a fixed period for planning purposes.
Incorrect Settings: If the settings are partially configured or incorrectly defined, the system may not be able to determine the planning periods.
Solution:
To resolve the CPE104 error, you need to ensure that either a period determination method or a fixed period is defined in the system. Here are the steps to do this:
Access Configuration:
- Go to the SAP Easy Access screen and navigate to the configuration settings for Controlling (CO).
- Use the transaction code
SPRO
to access the SAP Reference IMG.Define Period Determination:
- Navigate to Controlling > Cost Center Accounting > Planning > Define Period Determination.
- Here, you can define how the system should determine the periods for planning. You may need to create a new period determination strategy or modify an existing one.
Define Fixed Period:
- If you prefer to use a fixed period instead, navigate to Controlling > Cost Center Accounting > Planning > Define Fixed Period.
- Specify the fixed period that should be used for planning.
Check Settings:
- Ensure that the settings are correctly saved and activated.
- Review any related settings that might impact period determination, such as fiscal year variant and planning versions.
Test the Configuration:
- After making the necessary changes, test the configuration by attempting to execute the planning transaction again to see if the error persists.
Related Information:
KP06
(Cost Center Planning) or KEPM
(Profitability Analysis Planning) where this error might occur.By following these steps, you should be able to resolve the CPE104 error and successfully configure period determination or fixed periods in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CPE103
Define reference value for absulute surcharge
What causes this issue? A surcharge rule was defined with an absolute surcharge. A reference value for this surcharge is missing.System Response A s...
CPE102
Define reference values for maximum or minimum
What causes this issue? A calculation rule was defined with a maximum or minimum for the rate calculation. A reference value for these limits is miss...
CPE105
Define time unit of measurement routine
What causes this issue? A period determination rule was defined using time units before or after the base date without a time unit of measurement.Sys...
CPE106
Define date offset routine
What causes this issue? The period determination rule was defined with a number of time units for the offset, but without a date offset routine.Syste...
Click on this link to search all SAP messages.