How To Fix /CPD/SS_MESSAGES431 - Resource demand &1 dates are outside the work package &2 dates.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/SS_MESSAGES -

  • Message number: 431

  • Message text: Resource demand &1 dates are outside the work package &2 dates.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/SS_MESSAGES431 - Resource demand &1 dates are outside the work package &2 dates. ?

    The SAP error message /CPD/SS_MESSAGES431 Resource demand &1 dates are outside the work package &2 dates typically occurs in the context of project management or resource planning within SAP. This error indicates that there is a mismatch between the dates of a resource demand (such as a task or activity requiring resources) and the dates defined for the associated work package.

    Cause:

    1. Date Mismatch: The start or end date of the resource demand is outside the defined start and end dates of the work package. This can happen if:

      • The resource demand is scheduled to start before the work package begins.
      • The resource demand is scheduled to end after the work package ends.
    2. Incorrect Configuration: There may be incorrect settings or configurations in the project or work package that do not align with the resource demand.

    3. Data Entry Errors: Manual entry errors when creating or modifying resource demands or work packages can lead to this issue.

    Solution:

    1. Check Dates: Review the dates of both the resource demand and the work package. Ensure that the resource demand falls within the start and end dates of the work package.

    2. Adjust Resource Demand: If the resource demand is indeed outside the work package dates, adjust the start and/or end dates of the resource demand to align with the work package.

    3. Modify Work Package Dates: If the resource demand is correct and should remain as is, consider adjusting the work package dates to encompass the resource demand.

    4. Review Project Structure: Ensure that the overall project structure is correctly defined and that all related components (tasks, work packages, resource demands) are aligned.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing work packages and resource demands.

    6. Check Authorizations: Ensure that you have the necessary authorizations to make changes to the work package or resource demand.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP for managing projects, such as CJ20N (Project Builder) or CJ02 (Change Project).
    • SAP Notes: Check for any SAP Notes related to this error message for potential patches or updates that may address the issue.
    • Training and Support: If the issue persists, consider reaching out to your SAP support team or consulting with a professional who specializes in SAP project management.

    By following these steps, you should be able to resolve the error and ensure that your resource demands are correctly aligned with your work packages.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant