Do you have any question about this error?
Message type: E = Error
Message class: /CPD/SS_MESSAGES -
Message number: 327
Message text: Please create entries with a valid resource ID.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/CPD/SS_MESSAGES327
- Please create entries with a valid resource ID. ?The SAP error message
/CPD/SS_MESSAGES327
indicating "Please create entries with a valid resource ID" typically arises in the context of SAP's Capacity Planning and Demand Management modules. This error suggests that the system is unable to find a valid resource ID for the operation you are trying to perform, which could be related to planning, scheduling, or resource allocation.Causes:
- Missing Resource ID: The resource ID you are trying to use does not exist in the system.
- Incorrect Configuration: The resource may not be properly configured in the system, or it may not be assigned to the relevant planning area.
- Authorization Issues: The user may not have the necessary permissions to access or create entries for the specified resource.
- Data Inconsistencies: There may be inconsistencies in the master data or configuration settings related to the resource.
Solutions:
Check Resource ID: Verify that the resource ID you are using is correct and exists in the system. You can do this by navigating to the relevant resource master data transaction (e.g., CR01 for creating resources).
Create Resource: If the resource ID does not exist, you may need to create it. Ensure that all necessary fields are filled out correctly during the creation process.
Review Configuration: Check the configuration settings for the resource in the relevant planning area. Ensure that the resource is assigned correctly and that all required settings are in place.
Authorization Check: Ensure that the user has the necessary authorizations to create or modify entries related to the resource. You may need to consult with your SAP security team to verify this.
Data Consistency Check: Run consistency checks on your master data to identify any discrepancies that may be causing the issue. This can often be done through standard SAP reports or transaction codes.
Consult Documentation: Refer to SAP documentation or help notes related to the specific module you are working with for additional guidance.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/CPD/SS_MESSAGES326
Unable to access your production system to evaluate deletion checks.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES325
Cannot delete &1 since it has been used in project planning.
What causes this issue? An evaluation of your system indicates that resource &V1& has been used in project planning. Therefore, resource &...
/CPD/SS_MESSAGES328
Resource &1 is already assigned to resource type &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES329
Project &1: Project type should be either C or I.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.