How To Fix /CPD/SS_MESSAGES241 - Effort distribution does not match dates of work package &1.


/CPD/SS_MESSAGES241 - Overview

  • Message type: E = Error

  • Message class: /CPD/SS_MESSAGES -

  • Message number: 241

  • Message text: Effort distribution does not match dates of work package &1.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/SS_MESSAGES241 - Effort distribution does not match dates of work package &1. ?
    The SAP error message /CPD/SS_MESSAGES241 indicates that there is a mismatch between the effort distribution dates and the dates of the work package specified in the message. This typically occurs in project management or resource management scenarios where effort is allocated to specific work packages, and the dates of the effort do not align with the dates of the work package.
    
    Cause: Date Mismatch: The effort distribution dates (start and end dates) do not fall within the date range of the work package. Incorrect Configuration: The work package may have been configured with incorrect dates or the effort distribution may have been incorrectly entered. Changes in Project Plan: If the project plan has been modified (e.g., dates have been shifted), the effort distribution may not have been updated accordingly. Data Entry Errors: Manual entry errors when inputting effort distribution data.
    Solution: Check Work Package Dates: Verify the start and end dates of the work package referenced in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author