How To Fix /CPD/SS_MESSAGES235 - Profit center was not updated for project &1.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/SS_MESSAGES -

  • Message number: 235

  • Message text: Profit center was not updated for project &1.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/SS_MESSAGES235 - Profit center was not updated for project &1. ?

    The SAP error message /CPD/SS_MESSAGES235 indicates that the profit center was not updated for a specific project (denoted by &1). This error typically arises in the context of project management and controlling within SAP, particularly when dealing with project-related financial postings.

    Cause:

    1. Missing Profit Center Assignment: The project may not have a profit center assigned in its master data. Profit centers are essential for financial reporting and controlling, and if they are not assigned, the system cannot process transactions related to that project.

    2. Incorrect Configuration: There may be issues with the configuration settings in the controlling module (CO) or project system (PS) that prevent the profit center from being updated.

    3. Authorization Issues: The user may not have the necessary authorizations to update the profit center for the project.

    4. Project Status: The project might be in a status that does not allow updates to its master data, including profit center assignments.

    Solution:

    1. Check Project Master Data:

      • Navigate to the project in question and check the master data settings. Ensure that a profit center is assigned to the project.
      • You can do this by using transaction codes like CJ20N (Project Builder) or CJ03 (Display Project).
    2. Update Profit Center:

      • If the profit center is missing, you can assign it directly in the project master data. Make sure to save the changes.
    3. Review Configuration:

      • Check the configuration settings in the controlling module to ensure that profit center assignments are correctly set up for projects. This may involve reviewing the settings in transaction OKKP (Maintain Controlling Area) or KSV1 (Create Profit Center).
    4. Check User Authorizations:

      • Ensure that the user has the necessary authorizations to make changes to the project master data. This may involve checking roles and authorizations in transaction SU01 (User Maintenance).
    5. Project Status:

      • Verify the status of the project. If the project is locked or in a status that does not allow changes, you may need to change the status or unlock the project.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N, CJ03, CJ02 (Change Project), and OKKP.
    • Documentation: Refer to SAP documentation or help files for detailed guidance on project management and profit center assignments.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant