Message type: E = Error
Message class: /CPD/SS_MESSAGES -
Message number: 235
Message text: Profit center was not updated for project &1.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/CPD/SS_MESSAGES235
- Profit center was not updated for project &1. ?The SAP error message
/CPD/SS_MESSAGES235
indicates that the profit center was not updated for a specific project (denoted by&1
). This error typically arises in the context of project management and controlling within SAP, particularly when dealing with project-related financial postings.Cause:
Missing Profit Center Assignment: The project may not have a profit center assigned in its master data. Profit centers are essential for financial reporting and controlling, and if they are not assigned, the system cannot process transactions related to that project.
Incorrect Configuration: There may be issues with the configuration settings in the controlling module (CO) or project system (PS) that prevent the profit center from being updated.
Authorization Issues: The user may not have the necessary authorizations to update the profit center for the project.
Project Status: The project might be in a status that does not allow updates to its master data, including profit center assignments.
Solution:
Check Project Master Data:
- Navigate to the project in question and check the master data settings. Ensure that a profit center is assigned to the project.
- You can do this by using transaction codes like
CJ20N
(Project Builder) orCJ03
(Display Project).Update Profit Center:
- If the profit center is missing, you can assign it directly in the project master data. Make sure to save the changes.
Review Configuration:
- Check the configuration settings in the controlling module to ensure that profit center assignments are correctly set up for projects. This may involve reviewing the settings in transaction
OKKP
(Maintain Controlling Area) orKSV1
(Create Profit Center).Check User Authorizations:
- Ensure that the user has the necessary authorizations to make changes to the project master data. This may involve checking roles and authorizations in transaction
SU01
(User Maintenance).Project Status:
- Verify the status of the project. If the project is locked or in a status that does not allow changes, you may need to change the status or unlock the project.
Related Information:
CJ20N
, CJ03
, CJ02
(Change Project), and OKKP
.By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/CPD/SS_MESSAGES234
There are no internal projects to update the profit center.
What causes this issue? The following checks are true: There are no internal projects to process. All existing internal projects already have a profi...
/CPD/SS_MESSAGES233
No projects found for the given criteria.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES236
There is no plan data to evaluate.
What causes this issue? The following is true: The project does not contain any staffing rows to process. All staffing data for the project contain a...
/CPD/SS_MESSAGES237
&1 staffing rows created with type 'Unsupplied'.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...