Do you have any question about this error?
Message type: E = Error
Message class: /CPD/SS_MESSAGES -
Message number: 200
Message text: Project &1, work package &2: Enter a valid cost for expense &3.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/CPD/SS_MESSAGES200
- Project &1, work package &2: Enter a valid cost for expense &3. ?The SAP error message
/CPD/SS_MESSAGES200
typically indicates that there is an issue with the cost entry for a specific expense in a project or work package. Here’s a breakdown of the cause, potential solutions, and related information for this error:Cause:
Invalid Cost Entry: The error suggests that the cost entered for the specified expense is not valid. This could be due to:
- The cost being negative or zero.
- The cost not being in the expected format (e.g., incorrect currency).
- The cost exceeding predefined limits or thresholds set in the system.
Missing Configuration: There may be missing configuration settings in the project or work package that prevent valid costs from being recognized.
Data Integrity Issues: There could be issues with the data integrity in the project or work package, such as missing or incorrect master data.
Solution:
Check Cost Entry: Review the cost entry for the specified expense (
&3
). Ensure that:
- The cost is a positive value.
- The currency is correct and matches the project’s currency settings.
- The cost does not exceed any predefined limits.
Review Project and Work Package Settings:
- Ensure that the project (
&1
) and work package (&2
) are correctly configured.- Check if there are any specific rules or settings that might restrict the cost entries.
Validate Master Data: Ensure that all relevant master data (e.g., cost centers, internal orders) is correctly set up and active.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on cost entries in projects and work packages.
Error Logs: Check the system logs for any additional error messages or warnings that might provide more context about the issue.
User Authorization: Ensure that the user has the necessary authorizations to enter costs for the specified project and work package.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/CPD/SS_MESSAGES199
Project &1: Please assign all work packages to a sales order.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES198
The end date of project &1 is earlier than the start date.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES201
Project &1: Plan dates are not within dates of work package &2.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES202
Project &1 Work package &2: Enter a valid effort for &3, without decimals
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.