How To Fix /CPD/SS_MESSAGES147 - Work package &1: Dates are not within project dates.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/SS_MESSAGES -

  • Message number: 147

  • Message text: Work package &1: Dates are not within project dates.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/SS_MESSAGES147 - Work package &1: Dates are not within project dates. ?

    The SAP error message /CPD/SS_MESSAGES147 Work package &1: Dates are not within project dates typically occurs in the context of project management within SAP, particularly when dealing with work packages in Project System (PS) or related modules. This error indicates that the dates defined for a specific work package do not fall within the overall project dates.

    Cause:

    1. Mismatch of Dates: The start and end dates of the work package are set outside the defined start and end dates of the project.
    2. Project Date Configuration: The project itself may have been configured with specific start and end dates that do not encompass the dates of the work package.
    3. Changes in Project Dates: If the project dates were modified after the work package was created, the existing work package dates may no longer be valid.
    4. Incorrect Data Entry: There may have been an error during the data entry process, leading to incorrect dates being assigned to the work package.

    Solution:

    1. Check Project Dates: Verify the start and end dates of the project. You can do this by navigating to the project definition in SAP and checking the project details.
    2. Adjust Work Package Dates: If the work package dates are indeed outside the project dates, you will need to adjust the work package dates to ensure they fall within the project dates. This can be done in the work package details.
    3. Re-evaluate Project Scope: If the work package dates are correct and should remain as they are, consider whether the project dates need to be adjusted to accommodate the work package.
    4. Consult with Project Manager: If there are discrepancies or if you are unsure about the correct dates, consult with the project manager or relevant stakeholders to confirm the intended dates for both the project and the work package.
    5. Check for Dependencies: Ensure that there are no dependencies or constraints that might affect the dates of the work package or the project.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) to view and edit project and work package details.
    • Documentation: Refer to SAP documentation or help files for more detailed instructions on managing project dates and work packages.
    • User Authorizations: Ensure that you have the necessary authorizations to make changes to project and work package details.
    • SAP Notes: Check for any relevant SAP Notes that might address specific issues or bugs related to this error message.

    By following these steps, you should be able to resolve the error and ensure that the work package dates align correctly with the project dates.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.