How To Fix /CPD/PFP_SC_MESSAGES606 - Forecast period is greater than plan header end period


/CPD/PFP_SC_MESSAGES606 - Overview

  • Message type: E = Error

  • Message class: /CPD/PFP_SC_MESSAGES -

  • Message number: 606

  • Message text: Forecast period is greater than plan header end period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/PFP_SC_MESSAGES606 - Forecast period is greater than plan header end period ?
    The SAP error message /CPD/PFP_SC_MESSAGES606 indicates that the forecast period you are trying to use exceeds the end period defined in the planning header. This typically occurs in the context of planning and forecasting within SAP, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).
    
    Cause: Forecast Period Configuration: The forecast period you are trying to enter or process is set beyond the end date defined in the planning header. Planning Header Settings: The planning header may have been configured with a specific end date that does not accommodate the forecast period you are trying to use. Data Entry Error: There may be a mistake in the data entry where the forecast period is incorrectly specified.
    Solution: Check Planning Header Settings: Navigate to the planning header settings in your SAP system. Verify the end date of the planning header and ensure it aligns with the forecast period you are trying to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker