How To Fix /CPD/PFP_MESSAGES698 - Configure the method to update cut-off date for master project &1.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/PFP_MESSAGES -

  • Message number: 698

  • Message text: Configure the method to update cut-off date for master project &1.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/PFP_MESSAGES698 - Configure the method to update cut-off date for master project &1. ?

    The SAP error message /CPD/PFP_MESSAGES698 typically indicates that there is an issue with the configuration of the method used to update the cut-off date for a master project in the Project Management module. This error can arise in various scenarios, particularly when dealing with project planning and execution.

    Cause:

    1. Configuration Issue: The method for updating the cut-off date may not be properly configured in the system. This could be due to missing settings or incorrect parameters.
    2. Authorization Problems: The user may not have the necessary authorizations to perform the action related to the cut-off date update.
    3. Missing Master Data: Required master data for the project may be incomplete or missing, which can prevent the system from processing the cut-off date update.
    4. System Bugs or Incompatibilities: There may be bugs in the current version of the SAP system or incompatibilities with other modules or customizations.

    Solution:

    1. Check Configuration:

      • Navigate to the configuration settings for project management in SAP.
      • Ensure that the method for updating the cut-off date is correctly defined and active.
      • Review the settings in transaction codes like SPRO to access the Project Management configuration.
    2. Review Authorizations:

      • Verify that the user encountering the error has the necessary authorizations to update project data.
      • Check the roles and profiles assigned to the user in transaction PFCG.
    3. Validate Master Data:

      • Ensure that all required master data for the project is complete and correctly maintained.
      • Check for any missing or incorrect entries in the project definition or related objects.
    4. Consult SAP Notes:

      • Search for relevant SAP Notes in the SAP Support Portal that may address this specific error message or provide patches and updates.
    5. Testing and Debugging:

      • If possible, replicate the issue in a test environment to understand the conditions under which the error occurs.
      • Use transaction SE80 or SE37 to debug the function module or method that is responsible for updating the cut-off date.
    6. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP Support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and SPRO (Customizing).
    • Documentation: Review SAP documentation related to project management and cut-off date handling for additional insights.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed.

    By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker