How To Fix /CPD/PFP_MESSAGES649 - Link between ref. object &1 and commercial project &2 does not exist


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/PFP_MESSAGES -

  • Message number: 649

  • Message text: Link between ref. object &1 and commercial project &2 does not exist

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/PFP_MESSAGES649 - Link between ref. object &1 and commercial project &2 does not exist ?

    The SAP error message /CPD/PFP_MESSAGES649 indicates that there is a missing link between a reference object (like a cost center, internal order, or another project) and a commercial project in the Project Management (PS) module. This error typically arises when you are trying to perform an action that requires a valid relationship between these two entities, but such a relationship has not been established in the system.

    Cause:

    1. Missing Assignment: The reference object (e.g., cost center, internal order) has not been assigned to the commercial project.
    2. Incorrect Configuration: The configuration settings for the project or reference object may not be set up correctly.
    3. Data Inconsistency: There may be inconsistencies in the data, such as missing entries in the relevant tables.
    4. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or link the objects.

    Solution:

    1. Check Assignments:

      • Go to the relevant transaction (e.g., CJ20N for project management) and check if the reference object is correctly assigned to the commercial project.
      • If not, you can create the necessary assignment.
    2. Create Link:

      • If the link does not exist, you can create it by navigating to the project structure and adding the reference object to the project.
    3. Review Configuration:

      • Ensure that the configuration settings for both the reference object and the commercial project are correct. This may involve checking the project profile settings and ensuring that the necessary parameters are set.
    4. Data Consistency Check:

      • Run consistency checks in the system to identify any discrepancies in the data. This can often be done through standard SAP reports or transaction codes.
    5. Authorization Check:

      • Verify that the user has the necessary authorizations to access and modify the project and reference object. If not, contact your SAP security administrator to adjust the roles.
    6. Consult Documentation:

      • Refer to SAP documentation or help files for specific guidance on the error message and related transactions.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ01 (Create Work Breakdown Structure), and others related to project management.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to resolve the error and establish the necessary link between the reference object and the commercial project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker