How To Fix /CPD/PFP_MESSAGES248 - &1 can be transferred for WBS &2 to cost elem/acty. &3 for fiscal year &4


/CPD/PFP_MESSAGES248 - Overview

  • Message type: E = Error

  • Message class: /CPD/PFP_MESSAGES -

  • Message number: 248

  • Message text: &1 can be transferred for WBS &2 to cost elem/acty. &3 for fiscal year &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/PFP_MESSAGES248 - &1 can be transferred for WBS &2 to cost elem/acty. &3 for fiscal year &4 ?
    The SAP error message /CPD/PFP_MESSAGES248 typically indicates an issue related to the transfer of costs or postings to a Work Breakdown Structure (WBS) element in the context of project management and controlling. The message suggests that there is a problem with transferring costs to a specific cost element or activity for a given fiscal year.
    
    Cause: Invalid Cost Element/Activity: The cost element or activity specified in the error message may not be valid for the WBS element or may not be set up correctly in the system. Fiscal Year Issues: The fiscal year specified may not be open for postings, or there may be restrictions on posting to that year. WBS Element Status: The WBS element may be in a status that does not allow for cost postings (e.g., it may be closed or locked).
    Configuration Issues: There may be configuration issues in the project system or controlling area that prevent the transfer of costs. Missing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author