How To Fix /CPD/PFP_MESSAGES227 - Rescheduling for version &1 complete; save your changes


/CPD/PFP_MESSAGES227 - Overview

  • Message type: E = Error

  • Message class: /CPD/PFP_MESSAGES -

  • Message number: 227

  • Message text: Rescheduling for version &1 complete; save your changes

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/PFP_MESSAGES227 - Rescheduling for version &1 complete; save your changes ?
    The SAP error message /CPD/PFP_MESSAGES227 typically indicates that a rescheduling process for a specific version has been completed, and it prompts the user to save their changes. This message is often encountered in the context of planning and forecasting within SAP, particularly when using the SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) modules.
    
    Cause: Rescheduling Process: The message is triggered after a rescheduling operation has been executed for a planning version. This could be due to changes in demand, supply, or other planning parameters that necessitate a recalibration of the planning data. User Action Required: The system is indicating that the user needs to take action to save the changes made during the rescheduling process.
    Solution: Save Changes: The primary action required is to save the changes. You can do this by navigating to the appropriate menu option (usually "Save" or "Save As") in the SAP GUI or the relevant

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker