Do you have any question about this error?
Message type: E = Error
Message class: CPCL_VERS - Task List Version
Message number: 120
Message text: MBOM &1 with usage &2 is not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCL_VERS120
- MBOM &1 with usage &2 is not valid ?The SAP error message "CPCL_VERS120 MBOM &1 with usage &2 is not valid" typically relates to issues with the Multi-Level Bill of Materials (MBOM) in the context of production planning and control. This error indicates that the specified MBOM version is not valid for the given usage.
Cause:
- Invalid MBOM Version: The specified MBOM version (&1) does not exist or is not valid for the specified usage type (&2).
- Usage Type Issues: The usage type may not be correctly defined or may not correspond to the MBOM version you are trying to access.
- Data Inconsistencies: There may be inconsistencies in the data, such as missing or incorrect entries in the BOM master data.
- Authorization Issues: The user may not have the necessary authorizations to access the specified MBOM version.
Solution:
- Check MBOM Version: Verify that the MBOM version specified in the error message exists and is active. You can do this by navigating to the BOM transaction (e.g., CS03) and checking the version.
- Validate Usage Type: Ensure that the usage type specified is correct and that it is associated with the MBOM version you are trying to use. You can check this in the BOM configuration settings.
- Review BOM Data: Check for any inconsistencies or missing data in the BOM master data. Ensure that all necessary components and structures are correctly defined.
- Authorization Check: Ensure that the user has the necessary permissions to access the MBOM. You may need to consult with your SAP security team to verify this.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the error message and its implications.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CPCL_VERS119
Unit of measure of component assignment to OA is not compatible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS118
Change record may not be mandatory for rework routings
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS121
Serialized selected but material &1 in plant &2 has no serial no. profile
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS122
Routing profile only allows one MBOM assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.