Do you have any question about this error?
Message type: E = Error
Message class: CPCL_VERS - Task List Version
Message number: 023
Message text: You can only assign MBOMs
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCL_VERS023
- You can only assign MBOMs ?The SAP error message CPCL_VERS023 indicates that you are trying to assign a Bill of Materials (BOM) that is not a Manufacturing Bill of Materials (MBOM) in a context where only MBOMs are allowed. This typically occurs in the context of production planning or when working with the SAP Advanced Planning and Optimization (APO) module.
Cause:
- Incorrect BOM Type: The BOM you are trying to assign is not defined as an MBOM. In SAP, there are different types of BOMs, such as Engineering BOMs (EBOMs) and Manufacturing BOMs (MBOMs). The system is configured to only accept MBOMs for certain operations.
- Configuration Settings: The system may be configured to require MBOMs for specific production processes or planning scenarios.
- Data Entry Error: There may have been a mistake in the data entry where an incorrect BOM type was selected.
Solution:
- Check BOM Type: Verify the type of BOM you are trying to assign. Ensure that it is indeed an MBOM. You can do this by checking the BOM details in the SAP system.
- Create or Change BOM: If the BOM is not an MBOM, you may need to create a new MBOM or convert the existing BOM to an MBOM if applicable. This can typically be done in the BOM maintenance transaction (CS01, CS02, CS03).
- Review Configuration: If you believe the BOM should be accepted, review the configuration settings in your SAP system to ensure that it allows for the assignment of the BOM type you are working with.
- Consult Documentation: Refer to SAP documentation or your organization's SAP guidelines to understand the specific requirements for BOM assignments in your context.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and BOM management.
Get instant SAP help. Start your 7-day free trial now.
CPCL_VERS022
You require a material and a plant to assign an MBOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS021
Allocation of material &1 of version &2 is not consistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS024
You can only assign an MBOM version
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS025
BOM version &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.